| Project : Channel Tunnel
Rail Link
Client : Union Railways Limited
- Railway infrastructure modifications at Ashford and Dollands
Moor to facilitate the Channel Tunnel Rail Link
The design and construct contract involves modifications
to the permanent way layout, the signaling and telecommunications
systems and power supplies at Ashford Station, Dollands
Moor and the system-wide construction railhead at Beechbrook
Farm
Work also includes design and installation of new overhead
line equipment systems for the Eurostar trains at Ashford
Station and modifications to the existing catenary, etc
at Dollands Moor, an earlier Mowlem project
Involving over 30 abnormal possessions on the railway infrastructure
When completed in 2003, the new railway layout will provide
increased operational flexibility for the existing domestic
rail network whilst fully integrating the International
Station at Ashford and its connecting chords with the Channel
Tunnel Rail Link
|
|